Tuesday, 23 September 2014

Level 2 BIM and Lead Designer Responsibility

First of all, I am quite pleased to hear that NBS team has won to finish the missing pieces in level 2 BIM puzzle. Well done team NBS. Many congratulations.


  1. Digital Plan of Works
  2. A unified classification system

Link to the official NBS article.

Personally, I genuinely believe that these two pieces of Level 2 BIM are deal breakers in many ways to realise our Level 2 BIM dream.

I am looking forward to learn more about DPoW tomorrow at "BIM Through Plan of Works" event.

However, just focusing on Level 2 BIM and lead designer's responsibility in terms of design coordination, the following extracts from PAS1192-2:2013 and BIM Protocol summarise it all.

Design coordination through BIM can only be the most effective/efficient if lead designers (and main contractors post novation) start using BIM as a way of coordinating design as per PAS1192-2:2013 section 9.4.


Image Courtesy: PAS1192-2:2013



Image: An extract from CIC BIM Protocol

Monday, 8 September 2014

Trimble acuires Gehry Technologies

Back in 2012 Trimble announced strategic alliance with Bently. Two years later, Trimble makes another big step forward into AECO BIM world and acquires Los Angeles based one of the best design and project management solutions providers; Gehry Technologies.

This is going to be a game changer in terms of construction and operation BIMs.

"The alliance combines deep Architecture, Engineering and Construction (AEC) industry experience with advanced construction technology to empower visionary designers such as Gehry Partners to build groundbreaking projects on time, under budget and without change orders—enabling designers, builders and operators to collaborate more efficiently."


FULL ARTICLE

Friday, 5 September 2014