Tuesday 23 September 2014

Level 2 BIM and Lead Designer Responsibility

First of all, I am quite pleased to hear that NBS team has won to finish the missing pieces in level 2 BIM puzzle. Well done team NBS. Many congratulations.


  1. Digital Plan of Works
  2. A unified classification system

Link to the official NBS article.

Personally, I genuinely believe that these two pieces of Level 2 BIM are deal breakers in many ways to realise our Level 2 BIM dream.

I am looking forward to learn more about DPoW tomorrow at "BIM Through Plan of Works" event.

However, just focusing on Level 2 BIM and lead designer's responsibility in terms of design coordination, the following extracts from PAS1192-2:2013 and BIM Protocol summarise it all.

Design coordination through BIM can only be the most effective/efficient if lead designers (and main contractors post novation) start using BIM as a way of coordinating design as per PAS1192-2:2013 section 9.4.


Image Courtesy: PAS1192-2:2013



Image: An extract from CIC BIM Protocol