- Digital Plan of Works
- A unified classification system
Link to the official NBS article.
Personally, I genuinely believe that these two pieces of Level 2 BIM are deal breakers in many ways to realise our Level 2 BIM dream.
I am looking forward to learn more about DPoW tomorrow at "BIM Through Plan of Works" event.
However, just focusing on Level 2 BIM and lead designer's responsibility in terms of design coordination, the following extracts from PAS1192-2:2013 and BIM Protocol summarise it all.
Design coordination through BIM can only be the most effective/efficient if lead designers (and main contractors post novation) start using BIM as a way of coordinating design as per PAS1192-2:2013 section 9.4.
Image Courtesy: PAS1192-2:2013 |
Image: An extract from CIC BIM Protocol |